✓ Scientific
Construction
Steel
Convert
RPN Mode
⋯ drag ⋯
SCIENTIFIC
0
PRE-BUILD SETUP ▶
TDW CALCULATOR ▶
SJI CALCULATOR ▶
HEAD-TO-HEAD ▶
FEM ANALYSIS
ASSEMBLY ▶
SUMMARY ▶

□ BUILDING PARAMETERS □

——— BUILDING CONFIGURATOR ———
to
to
Orientation

Assemble your designed members into a complete structure

Total Width 400 ft
ROOF FRAMING PLAN
BUILDING SUMMARY
0
Columns
0
Girders
0
Trusses
0
Deck SF
0
Steel Tons
TDW TRUSS PARAMETERS
Total Weight
516.59 lbs
Total MOI
2186.458 in⁴
Deflection
0.825"
Deflection Ratio
L/727
TDW Truss Diagram
◼ Top/Bottom Chords (HSS) ◼ Diagonal Struts ◼ Vertical Struts ◼ Gusset Plates
Deflection Analysis
PASS
TDW STANDARD (L/480)
≤ 1.250"
PASS
TDW WAIVERED (L/360)
≤ 1.667"
PASS
CODE MINIMUM (L/240)
≤ 2.500"
Performance Factor: 1.52x better than TDW L/480 standard
Member Details
MemberSizeQuantityLengthWeight
Top ChordsHSS 1×1×0.125"2600 in131.02 lbs
Bottom ChordsHSS 1×1×0.125"2600 in131.02 lbs
Diagonal StrutsHSS 1×1×0.125"20 pairs33.54 in146.49 lbs
Vertical StrutsHSS 1×1×0.125"10 pairs30.00 in65.51 lbs
GussetsGrade 100 Plate40Various42.54 lbs
TOTAL516.59 lbs
Capacity Analysis
Top Chord Axial:15.31 lbs
Bottom Chord Axial:15.31 lbs
Struts Axial:45.94 lbs
Gussets Axial:750.00 lbs
Panel Width:5.00 ft
Diagonal Length:2.80 ft
Diagonal Angle:45°
Total Panels:10.00
SJI JOIST PARAMETERS
Warning: SJI calculations reflect PUBLISHED values. Actual field capacity may be 40-55% lower due to re-cert A36, MIG HAZ damage, and eccentric load paths.
Apply Re-Cert A36 Factor (-28%)
Apply MIG HAZ Damage (-15%)
Apply Eccentric Load Path (-8%)

Reality Check Applied

The following real-world factors reduce published capacity:
  • Re-Cert A36: -28%
  • MIG HAZ: -15%
  • Eccentric: -8%
Total Reduction: 44%
Joist Weight
850 lbs
Joist Depth
24"
Actual Capacity
259 plf
Required
500 plf
SJI Joist Diagram
■ Top/Bottom Chords (Double Angles) ■ Web Members (Crimped Single Angles) ⚠ Welded Tabs (Failure Point)
Capacity Analysis
Published (SJI Tables)
INADEQUATE
460 plf
Based on Grade 50 material, perfect welds, concentric loads
Actual (Real-World)
INADEQUATE
259 plf
Accounts for re-cert A36, MIG HAZ, eccentric loads
CAPACITY EXCEEDED
This joist is 93% overstressed under real-world conditions.
Deflection Analysis
DESIGN STANDARD
L/240
SJI Code Minimum
ALLOWABLE
2.500"
ESTIMATED ACTUAL
L/221
Warning: SJI joists are designed to L/240 - the bare minimum allowed by code. This provides no margin for error, load underestimation, or dynamic effects.
Connection Warning
SJI joists use welded tab connections:
  • Tabs are MIG welded to joist ends
  • Joist sits ON TOP of bearing (gravity only)
  • No positive connection against uplift
  • Wind reversal can wrench tabs off
Amazon St. Louis (Dec 10, 2021): 6 workers killed when joist tabs wrenched off under wind uplift. Roof lost diaphragm action. Walls collapsed inward.
STRUCTURAL COMPARISON

TDW VS SJI

Same span, same loading - different results

□ SELECT FROM SUMMARY

□ COMPARISON PARAMETERS

□ TDW TRUSS SYSTEM

WINNER
4
Trusses Required
12.5'
Spacing O.C.
Deflection Ratio:L/388
Actual Deflection:1.548"
Weight per Truss:1378 lbs
Total Steel Weight:5510 lbs
Steel Grade:Grade 70-100
Weld Type:Laser (1/8" HAZ)
Connection:Embedded Saddle
□ Cannot fail without wall destruction

□ SJI JOIST SYSTEM

INFERIOR
9
Joists Required
6.25'
Spacing O.C.
Deflection Ratio:L/240
Actual Deflection:2.500"
Weight per Joist:900 lbs
Total Steel Weight:8100 lbs
Steel Grade:Re-Cert A36
Weld Type:MIG (1"+ HAZ)
Connection:Welded Tabs
□ Tabs wrench off under wind uplift
□ TDW ADVANTAGE SUMMARY
56%
Fewer Members
4 vs 9
1.6×
More Rigid
L/388 vs L/240
2-3×
Material Strength
Gr100 vs Re-Cert A36
8×
Less HAZ Damage
Laser vs MIG

□ THE CRITICAL DIFFERENCE

TDW Embedded Saddles

Truss is CAPTURED in wall structure. Cannot separate without destroying the wall itself. Building stays standing.

SJI Welded Tabs

Joist sits ON TOP of tabs. Wind uplift wrenches tabs off. Roof loses diaphragm action. Walls collapse. People die.

"Amazon St. Louis, December 10, 2021: 6 Dead"
MEMBER LIBRARY

DESIGN SUMMARY

Trusses and girders designed and ready for building assembly

TRUSSES
No trusses designed yet.
Design a truss in TDW Calculator and click "Add to Summary"
GIRDERS
No girders designed yet.
Design a girder in TDW Calculator and click "Add to Summary"
DECK
No deck assigned yet.
Assign deck types in Assembly tab
ACCESSORIES
No accessories placed yet.
Place accessories in Assembly tab
BUILDING PLAN
Building plan not assembled yet.
Configure in Pre-Build and Assembly tabs
TOTALS
Category Count Weight (lbs) Weight (tons)
Trusses 0 0 0.00
Girders 0 0 0.00
Deck 0 SF 0 0.00
Bridging 0 pcs 0 0.00
Accessories 0 0 0.00
Columns 0 0 0.00
TOTAL STEEL — 0 0.00
PSF
Stress Scale
No LoadFailure

□ NASG TDW TRUSS — FEM ANALYSIS

NO LOAD
—
Deflection Ratio
—
Max Deflection
0%
Utilization

□ SJI STANDARD JOIST — FEM ANALYSIS

NO LOAD
—
Deflection Ratio
—
Max Deflection
0%
Utilization
—
× Stiffer (TDW vs SJI)
—
TDW Deflection Ratio
—
SJI Deflection Ratio
L/480 vs L/240
Selected Standards
SJI PUBLISHED LOAD TABLE AUDIT — Math Verification

Selects the joist currently active in the SJI Calculator tab and verifies published capacities against first-principles engineering using the official SJI Ix formula: Ij = 26.767 × W × (L − 0.33)³ × 10⁻⁶ where W = the published L/360 deflection load. Reality factors (recertification, eccentric loading, HAZ) are then applied to show effective capacity.

ASSEMBLY Assign trusses, girders, deck, then place accessories
Select a sub-tab below to begin assembly X: — Y: —
Configure your building in Pre-Build Setup
0
Trusses
0
Girders
0
Columns
0
Deck SF
0
Bridges
0
Sleeves
0
Embeds
0
Accessories
0
Steel Tons
1 Accessories
2 Deck Assignment
3 Truss Assignment
4 Girder Assignment
5 Columns/Walls
E
Embeds
TL
Truss Lock
B
Speed Bridging
S
Top Straps
R
RTU/HVAC
A
AC Unit
X
Exhaust Fan
F
Fire Suppression
OC
Overhead Crane
☀
Solar Zone
C
Conduit
K
Skylight
H
Roof Hatch
V
Smoke Vent
D
Roof Drain
F
Fall Protect
L
Lightning
CR
Crane Rail
DU
Dunnage
PLACED ITEMS (0)
No items placed yet.
ADDED LOADS
Mechanical:0 psf
Solar:0 psf
Fire:0 psf
Total Added:0 psf
BayAisle WidthTruss DesignationCountWt EachBay Total
TRUSS LIBRARY
Design trusses in TDW first
LOADING
Girder RowCountGirder DesignationTruss LoadDeck LoadMisc LoadTotal/UtilWt EachRow Total
GIRDER LIBRARY
Design girders in TDW first
GIRDER TOTALS
Grid LocationTypeAccumulated LoadRequiredRecommendationStatus
LOAD SUMMARY
Complete assignments first
WALL SPECS
Based on loads